.jpg)
BIM Clash Detection & Coordination Services
Identify Clashes Before They Become Construction Problems

Qualified
Architects

Software
Proficiency
.png)
Quick
Turnarounds
Multiple
Business Models

VDEC provides BIM Clash Detection and Coordination Services that help AEC project teams identify, analyze, prioritize, and resolve conflicts between Architectural, Structural, and MEPF systems before construction.
By using federated BIM models and structured coordination workflows, we help architects, engineers, contractors, developers, and BIM teams improve constructability, reduce rework, and deliver better-coordinated construction information.
01 — The Challenge
Modern construction projects involve multiple disciplines working simultaneously within increasingly complex and constrained spaces. Even small coordination issues can lead to major site delays, redesign, and additional costs.
Common challenges include:
• HVAC ducts clashing with structural beams
• Pipes conflicting with electrical containment
• MEPF services competing for limited ceiling space
• Equipment access and maintenance clearance issues
• Structural openings not aligned with MEP requirements
• Architectural and MEP coordination gaps
• Multiple design revisions creating new conflicts
• Large numbers of clashes that are difficult to prioritize
• Clashes identified only after construction begins
• Lack of clear responsibility for resolving coordination issues
VDEC identifies these conflicts digitally, prioritizes them based on project impact, and supports project teams in resolving them before they become site problems.
02 — VDEC Solution
Our BIM Clash Detection & Coordinationapproach combines automated clash detection with engineering-based review and constructability analysis.
We coordinate multidisciplinary models to identify:
Hard Clashes
Physical conflicts where two or more elements occupy the same space.
Soft Clashes
Insufficient clearance around equipment, services, access zones, maintenance areas, or required installation spaces.
Workflow / 4D Clashes
Conflicts related to construction sequencing, temporary works, installation access, or planned construction activities.
Constructability Issues
Potential installation or maintenance problems that may not be identified through automated geometric clash detection alone.
Our Coordination Services
• Multidisciplinary BIM Coordination
• Architectural Coordination
• Structural Coordination
• HVAC Coordination
• Electrical Coordination
• Plumbing Coordination
• Fire Protection Coordination
• MEPF Coordination
• Hard & Soft Clash Detection
• Constructability Review
• Clash Prioritization
• Coordination Meetings Support
• Clash Resolution Tracking
• Model Review & Validation
• Coordination Drawing Support
03 — Deliverables
BIM Coordination Models
• Federated BIM Model
• Architectural Coordination Model
• Structural Coordination Model
• MEPF Coordination Model
• Combined Multidisciplinary Model
Clash Detection Outputs
• Clash Detection Reports
• Hard Clash Reports
• Soft Clash Reports
• Clearance / Access Reviews
• Clash Grouping & Prioritization
• Clash Screenshots / Views
• Clash Locations & Coordinates
• Discipline-Based Clash Reports
Coordination Outputs
• Coordination Views
• Marked-Up Models
• Issue Tracking Information
• Clash Resolution Reports
• Coordination Drawings
• Updated / Resolved BIM Models
• Final Coordinated Model
04 — Our Process
01. Model Collection & Review
We collect and review the latest Architectural, Structural, HVAC, Electrical, Plumbing, Fire Protection, and other relevant BIM models.
02. Model Validation
Before running clash detection, we review model integrity, coordinates, levels, model versions, element classifications, and overall suitability for coordination.
03. Federated Model Creation
Individual discipline models are combined into a coordinated federated BIM environment.
04. Clash Detection
Automated clash tests are performed based on project requirements, discipline combinations, tolerance values, and defined coordination rules.
05. Engineering & Constructability Review
Our BIM team reviews detected issues beyond simple geometric intersections, considering installation, access, maintenance, clearance, sequencing, and constructability.
06. Clash Classification & Prioritization
Clashes are grouped and prioritized based on severity and project impact, helping project teams focus on critical issues first.
07. Coordination & Resolution
Identified issues are communicated to the responsible discipline or design team. Updated models are reviewed to confirm that clashes have been resolved.
08. Final Validation
A final coordination review is performed to verify that critical clashes have been addressed and the coordinated model is ready for the next project stage.
05 — Software & Technology
Our BIM coordination teams work with industry-standard technologies, including:
Autodesk Navisworks | Autodesk Revit | AutoCAD | Autodesk Construction Cloud (ACC) | BIM 360
We can also work within client-specific BIM Execution Plans, coordination standards, Common Data Environments, clash matrices, and issue-management workflows.
06 — Benefits
Identify Problems Early
Detect coordination issues digitally before they reach the construction site.
Reduce Rework
Resolve conflicts during design and coordination instead of during installation.
Improve Constructability
Evaluate whether coordinated systems can actually be installed, accessed, maintained, and constructed.
Reduce Construction Risk
Minimize unexpected site conditions, redesign, delays, and coordination-related disruptions.
Better Multidisciplinary Coordination
Create a common digital environment where Architecture, Structure, and MEPF disciplines can be coordinated effectively.
Prioritize Critical Issues
Focus project teams on high-impact clashes instead of spending time on low-priority or duplicate issues.
Improve Site Execution
Provide construction teams with coordinated information that supports efficient installation.
Improve Project Communication
Clear clash reports and visual coordination outputs make technical issues easier for project stakeholders to understand and resolve.
Better BIM Model Quality
A coordinated model provides a more reliable foundation for construction documentation, fabrication, installation, and handover.
07 — Example Project
BIM Clash Detection & MEPF Coordination for a High-Rise Development
Project Type: High-Rise Commercial / Mixed-Use Development
Scope: BIM Coordination + Clash Detection + Constructability Review
Disciplines: Architecture + Structure + HVAC + Electrical + Plumbing + Fire Protection
LOD: 350
VDEC Approach
VDEC received multidisciplinary BIM models and established a federated coordination environment for the project.
The team performed systematic clash detection across MEPF services, structural elements, architectural components, ceiling spaces, shafts, plant rooms, and service zones.
Detected issues were categorized by discipline and severity. Critical clashes affecting construction and installation were prioritized for resolution.
VDEC then reviewed updated models and performed subsequent coordination checks to verify that identified issues had been resolved.
Outcome
The coordinated BIM workflow helped the project team identify conflicts before construction, improve service routing, reduce coordination risks, and provide better construction-ready information for site execution.
08 — Coordinate Before You Construct
Every unresolved clash has the potential to become a site delay, redesign, additional cost, or rework.
VDEC helps project teams move from reactive problem-solving to proactive digital coordination by identifying and resolving conflicts before construction begins.
From BIM Clash Detection and multidisciplinary coordination to constructability review and final model validation, we help make complex projects more coordinated, predictable, and buildable.
.png)